Showing posts with label Shooting Script. Show all posts
Showing posts with label Shooting Script. Show all posts

Sunday, 3 March 2013

Shooting Script 2.05.2013

Location:
Greenwich Park and the Greenwich Foot Tunnel

Shots we where filming:

  • Extra death scene shots which include close ups and longer shots which meant that the death was captured as last time my camera decided to cut at the one point before the entire shot was fully finished and therefore this meant that we needed to return in order to do some more disorientating and more focused death shots. 
  • We also went into Greenwich park with Lily dressed as the clown and then filmed her on the Band Stand which looks quite relatable to a circus and also we did one of her behind a tree which makes her look mysterious and scary. 
  • We also filmed the stairs shots which were deleted by accident last time but we have them just incase they need to be included in order to show him walking down the stairs etc. 
Time we got there:
  • We got there around 1pm and therefore the buses were running slow so whilst we were waiting for Chloe and Josh we decided to go to Greenwich park in order to film a couple more shots in order to use in the montage scene and therefore got more stuff filmed than we had planned to.
  • We then all met up around 2:30pm at the tunnel and then filmed in therefore around 30-45 minutes doing some more death scene footage in order to speed up and edit in the class on the monday.
  • We then left around 4:00pm after looking around to see if there were any other footage moments however no where else seemed suitable and therefore we decided to go home. 
Props which we took with us:
. We took the camera in order to film and before we went we searched up the camera and found out that it had an IA setting which meant that the skyline would film in a better quality.
. We also took the tripod (Gorilla Stand) which wraps around objects and therefore made it easier in order to film the skyline as we attached it too the beam and then it was steady when it filmed.

Who went:
Lily, Becky, Chloe and Josh



Sunday, 20 January 2013

Shooting Script for 9.01.2013

Location:
Greenwich Underpass/Cutty Sark

Shots which we where filming:
. We were going to re film the skyline again as when we had gone before it turned out too dark and therefore we are aiming in order to film at different times in order to put together a few different skyline shots in different lights.
. We also did shots of inside the tunnel for the credits as we wanted different spooky/creepy shots from inside the tunnel as the credits rolled around with different effects placed over the top.

Time we got there:
. We got there around 4:10 when it was just coming up to the sunset and therefore we did a shot of the skyline in a lighter environment to see whether or not it would be useable in our opening.
. We left around 6 when it was completely dark and all the lights where on in the buildings of the skyline and these proved to be more effective as they stood out much more and it made the skyline more prominent than with the lights off.
. We stayed there for the entire time and took other shots in different lights and explored the area in order to look around the college and see if there where any other locations which we could consider but many of them where too far away from the actual tunnel itself.

Props which we took with us:
. We took the camera in order to film and before we went we searched up the camera and found out that it had an IA setting which meant that the skyline would film in a better quality.
. We also took the tripod (Gorilla Stand) which wraps around objects and therefore made it easier in order to film the skyline as we attached it too the beam and then it was steady when it filmed.


Who went:
. Lily, Becky and Lauren


P.S. we couldn't film in the week after because we where planning on visiting the location on Saturday 19th January but due to the snow we where unsure about whether we could get there or whether it would get worse throughout the day and find it difficult in order to get back. Also the clowns shoes have not yet been done and therefore it would be the point of view shot which we would film, but if there was snow on the floor then we couldn't because there would be snow in one shot and not the other. Therefore we decided that we where going to do it a different time as a group when the snow was gone and everything was complete and therefore restrict the amount of re filming we have to do.